DEBURRING - FINISHING
QUALITY CONTROL

The operations carried out in this area are meant to separate refractory from metal, so as to grant total cleanliness of jets. Routine dimensional and metallurgical checking follow this phase.
Production cards, being brought along with the product from the Engineering Department to the Casting room, are inspected by the Quality control staff, and will be part of the documentation of the finished product. A certificate of metal chemical analysis, of the heat treatment carried out and any other possible control can be probided on request along with the shipped goods

immagine sbavatura 1

immagine sbavatura 2

© 2005 I.C.I. S.r.l. | CREDITS | Privacy e Cookie Policy